HALL RENOVATION - 1990
Page 4
During the renovation, a handicapped accessible entrance and a handicap ramp to the bathrooms were. Below, you can see workers outside finishing the sidewalk that leads back to entrance. Also, pictured is the new entrance with a ramp leading down to the floor.
| Workers finishe the side walk. | Ramps leading down to floor & up to bathrooms | |
![]() |
![]() |
The town library had always been a place where people would gather to sit and talk over a cup of coffee. This area of the Hall was also completely renovated. Below you can see pictures of the work, and of the finished library.
| Workers installing new ceiling in Library | New walls for the Library | ||
![]() |
![]() |
| The Finished Library |
![]() |
| Melrose locals sit and talk over cofee |
During the renovation, some extras were added that put the finishing touches on the project. A new sign above the main entrance and a new mural to greet visitors.
| New Sign | Mural | |
![]() |
![]() |